Everything you need to know about building in Australia.
Standard 1-2 storey homes on unconstrained sites
Custom designs, constrained sites, heritage areas
Site preparation, excavation, piering (if required)
Foundation concrete slab or strip footings poured
Wall frames, roof trusses, and structural steel erected
Roof complete, external walls clad, windows and doors installed
CRITICAL STAGE - Last chance to see inside walls
Internal fit-out: plasterboard, tiling, cabinetry, second fix electrical/plumbing
Build complete, ready for handover inspection
6 years structural, 2 years non-structural